ChargeLink Native
Developed byDEVlink

Supported, Conditional, and Planned Capabilities

This page prevents a common support problem: treating every visible command, test catalogue row, or roadmap integration as an unconditional production claim. Always distinguish implemented and supported, implemented with environment prerequisites, and planned/not part of the current customer workflow.

How to read the status

StatusMeaning for the operating user
SupportedIntended for customer use in the installed release when licensed and configured as documented.
ConditionalImplemented, but successful use depends on hardware, certificates, third-party software, edition, or a validated customer environment.
Engineering / readinessUseful for regression, interoperability preparation, or evidence generation; it must not be represented as accredited certification.
PlannedNot part of the current operating workflow. Do not install dependencies or create procedures around it yet.

Current customer-facing capability matrix

The exact installed version and license are authoritative. Use chargelink --version, chargelink license entitlements, chargelink profile list, and the package catalogue on the target workstation.

AreaCustomer statusImportant boundary
ISO 15118-20 EVSE/EVCCSupported/conditional by selected AC/DC, security, BPT and physical environmentExternal interoperability still depends on peer implementation, PLC/network path and PKI where used.
ISO 15118-2 EVSE/EVCCSupported/conditionalSelect a profile matching AC/DC and EIM/PnC/TLS behavior.
DIN 70121 DCSupported/conditionalLegacy DC workflow; do not apply ISO 15118-specific expectations blindly.
CHAdeMOConditionalPhysical operation requires the supported CAN adapter, driver, wiring and bench safety controls.
ChaoJi / GB/TConditional / engineering package depending on editionCAN/CAN-FD and physical-bench prerequisites apply.
NACS / SAE J3400Readiness/conditional according to installed packageConnector/PLC/physical coverage and standards claim boundaries must be checked for the actual release.
MCSReadiness/conditional according to installed packageHigh-power physical validation requires the correct external hardware and safety environment.
Native gRPC Integration APISupportedRemote exposure requires production authentication/TLS/authorization configuration appropriate to the edition.
NI VeriStand Native GatewaySupported/conditionalUses NI VeriStand ClientAPI/Gateway components and the ChargeLink NativeClientBroker/OperatorLauncher.
ASAM XIL for VeriStandPlanned for a later ChargeLink releaseNot required for the current VeriStand workflow. Do not configure the present product around XIL.
Conformance/ATS packagesEngineering/conformance-readiness unless a separate certification scope says otherwiseA ChargeLink verdict is not automatically an accredited certificate or standards-body approval.
Physical high-voltage safetyOutside software claimSite procedures, interlocks, DUT limits and lab safety systems remain authoritative.

Package catalogue versus executable reality

A package can contain cases that are not executable in the current environment. Typical reasons:

  • the selected PICS/PIXIT makes a case not applicable;
  • the required authorization or certificate path is not configured;
  • physical CAN/PLC hardware is absent;
  • the selected license does not include that package;
  • a case is intentionally retained as blocked/audit-only evidence.

Do not report a smaller executed campaign as "missing cases" until applicability and blockers have been reviewed.

Version-sensitive behavior

CLI syntax, defaults, package contents, profile IDs, and integration dependencies can change between releases. For a controlled test procedure:

  1. record chargelink --version;
  2. archive the selected profile output;
  3. archive PICS/PIXIT and campaign inputs;
  4. record the documentation package version;
  5. do not copy a command from a newer manual into an older installed build without checking --help.

External certification and standards text

ChargeLink documentation describes product behavior and customer-safe test metadata. It does not reproduce licensed standards text. Conformance-readiness evidence does not itself establish certification, accreditation, regulatory approval, connector qualification, or high-voltage safety approval.

When to contact support before testing

Contact support before a live run if:

  • your installed profile/package does not match the purchased scope;
  • the required third-party version is outside the release matrix;
  • a production TLS/PnC setup requires a certificate path not described for your edition;
  • the DUT requires a nonstandard network/CAN configuration;
  • you need to make a certification or formal compliance claim based on ChargeLink output.